Canglong Steel structure Co., Ltd in china since 2003
In the newly constructed steel structure platform of the steel structure workshop, there is no need to consider the problem of damage except for the improper design. The damage to the steel workshop structure is often caused by the use of a long time, and it is not caused by human damage, but is often caused by the improper use of large machinery or equipment. The components of the steel structure factory workshop will suffer fatigue failure under repeated overload use. It starts with bending of the steel beam, then expands to the appearance of fine cracks, and then breaks. There is no danger immediately after bending.
At this time, the side of the newly added steel beam close to the curved steel beam can be used to bear the force, and the crack generation to expansion is very slow. The steel is not brittle but has a certain toughness. If the steel beam is broken, it is more often in winter. Of course, once the steel beam is bent, it is best to take remedial maintenance and preventive measures, so as not to cause danger.
When using the steel structure workshop building, use it strictly according to the design load. If there is a problem with the material of the steel member, it may also cause fission when it is not used properly, and there is no obvious sign of slight fission of the material. Such as abnormal or obvious deformation, etc., it may happen instantaneously. During brittle fracture, the load may be very small, or even there is no external load, and the risk of brittle fracture damage is high. Therefore, a professional steel structure company and a reasonable steel structure design scheme and standardized construction are very important.
Early prevention is the main priority, and remedial measures change the plan. Errors in the design, production, and construction of steel structure workshop, as well as irregular use and operation during application. Temperature differences lead to deformation, cracking and warping of components or connections; insufficient structural bearing capacity due to load changes, extended service, changes in codes and procedures. Corrosion caused by chemical corrosion and electrochemical corrosion of steel structural member sections. Due to various accidental deformations, twists, damages, dents, etc. As a result, the section of the member is weakened, the member is warped, and the fracture can be reinforced.
LEAVE A MESSAGE
If you have any questions about our products or services, feel free to reach out to customer service team.
Copyright © 2003-2025 Canglong Steel structure Co., Ltd. | All Rights Reserved