Recently, the modern welding workshop project in the Democratic Republic of Congo, with a complete set of prefabricated steel structure kits provided by Canglong Group, is in its core installation phase. This multi-functional mezzanine steel structure workshop has been fully erected, demonstrating the strong capabilities of the efficient integration of Chinese manufacturing and African industrialization.
This project is a high-standard workshop specifically designed for heavy industrial welding operations. It adheres to Canglong Group's top engineering standards in terms of structural strength and spatial stiffness:
Main Frame: The project adopts a classic portal frame structure system. All main beams and columns are made of high-strength H-beams, possessing excellent load-bearing capacity and earthquake and wind resistance performance, providing rock-solid mechanical support for heavy machinery operations and long-term dynamic loads within the workshop.
Secondary Structural Grid: The support system uses precision CNC-punched C-shaped steel purlins, tie rods, and bracing. The dense secondary structural mesh not only effectively transfers spatial loads but also lays a perfect foundation for the smooth laying of subsequent external cladding panels.

To address the integrated space requirements of the welding workshop, encompassing production, office, and warehousing, Canglong Group customized an internal mezzanine system. Currently, this area is being installed in tandem with the main frame:
Corrugated Floor Decking: The mezzanine platform is laid with Canglong's high-strength corrugated floor decking. This material serves as a permanent formwork for concrete pouring and also works in conjunction with the steel beams, significantly enhancing the floor's overall load-bearing capacity.
Integrated Steel Staircase: Also delivered with the kit is a fully prefabricated industrial steel structure staircase, achieving a seamless spatial connection between the production workshop and the second-floor office/R&D area.
Considering the local construction conditions in the Democratic Republic of Congo, Canglong Group's one-stop kit solution achieves zero-defect prefabrication in the factory and modular assembly on-site:
Fully bolted, weld-free connections: All H-beams, columns, secondary structural components, and stair accessories are fully CNC-cut, precisely punched, and coated with high-standard anti-corrosion coatings at Canglong's Henan, China base. On-site installation utilizes 100% high-strength bolt connections, eliminating any welding processes. This significantly lowers the technical barriers to on-site construction and reduces assembly speed by more than 50% compared to traditional construction methods.
Complete system kit closed loop: Canglong not only provides the steel frame structure but also delivers a 100% full-function building package, including floor decking, tie rods, node plates, high-strength bolts, and a complete set of fasteners, ensuring seamless project progress.
Are you also planning to build a high-standard industrial plant with internal platforms or mezzanines in Africa or overseas? Contact Canglong Group, and let us tailor an integrated EPC solution that balances space utilization and cost-effectiveness for you.